Infeon Engineering•April 5, 2026•8 min read
Weeks 1–2: Discovery
Define the one user, the one problem, and the one outcome. Pick three KPIs you'll measure post-launch. Anything that doesn't move those KPIs gets cut.
Weeks 3–4: Design + Architecture
Lo-fi prototypes, clickable flow, and a thin architecture blueprint. No design system polish at this stage.
Weeks 5–10: Build
3 two-week sprints. End every sprint with a demo to real users.
Weeks 11–12: Launch
Closed beta with 20–50 users, fix the top-5 issues, then open up.